      |
 |
| AUTOMATIC
ONCE THROUGH STEAM BOILER |
| |
|
 |
 |
(Product liability is insurance 15million NTD with The First Insurance company)
|
|
Energy Conservation,
lowering the cost and high efficiency is the first priority
of our BJB boiler series. main advantages are as followed: |
| |
(1) |
Special heat conduction
design ,allows heat-transfer enhancement. |
| |
(2) |
Top and bottom of the
boiler water tube is welded and protected for heat resistance,
to prevent from crack causes from metal expansion and contraction
expose to heat or cold ,this will ensure the boilers life and
its durability. |
| |
(3) |
Boiler's water tube uses
the STB-340 seamless carbon steel pipe, air chamber,
Water drum , Upper and lower uses the SB-450 steel plate |
| |
(4) |
Once through boiler, the
interior of the furnace develops flow of hot air and the structure,
enables it to combust which cause heat to increase the conductance
heating around the surface to provide heat for water pipes exterior. |
| |
(5) |
Designed with Dual water
and steam separator ,steam capable maintain 99%
above |
| |
(6) |
Compact size doesn't occupy
large space, no pollution, low noise, heavy oil, diesel oil,
and gas are applicable. |
| |
(7) |
Based to rigorous manufacture
design, all BJB series model are also capable install in series
system with main control station to auto control each boiler
individually to support minimum requirement steam as needed.
This reduces fuel cost at same time and it doesn’t affecting
on production. |
| |
(8) |
energy conservation, low
cost, boiler efficiency reaches as high as 89 ﹪ above. |
| |
(9) |
Quick Start up, using
pressure ready within 5 minutes.
In addition to the above advantages, BeenJau boiler is conform
to inspection of the laborer safety, no operating license
or inspection license is required.
|
| Design, construction,
test run, training and completely post-sell service. |
| |
(1) |
Design: According to the Boiler regulation
of Chinese national standard CNS 10897-B1341and CNS2139-B1023 |
| |
(2) |
Construction: Uses JIS and the DIN
specification product. |
| |
(3) |
Test: Each set of Boiler is tested
strictly by technician in the factory with quality control and
absolutely guarantied. |
| |
(4) |
Training: test run, training, and maintenance,
to ensure boiler life. |
| |
(5) |
Post-sell service: provide to you
the best post –sell service there is. |
|
 |
|